Why Are Peralta and Mowry in Such Bad Shape? Fremont's Worst Streets, Explained

a funded repair plan, explained

Why Fremont's Peralta Blvd, Mowry Ave, Thornton Ave, and Fremont Blvd fell into such bad shape, and how the city is repaving them ahead of a delayed state land sale. A local explainer from Lily Garipova.

If you drive Peralta Boulevard, Mowry Avenue, Thornton Avenue, or Fremont Boulevard and have wondered why the pavement is so much worse than every other street in the city, this page explains the structural reason and the funded repair plan. It is written for Fremont homeowners, especially in the Centerville corridor, and for buyers evaluating homes along these roads.

The short answer

These four roads were not ordinary city streets. They were state highway pavement, maintained to old Caltrans (the California state highway agency) standards. When the state handed them to Fremont, the repair money was tied to a land sale that has not closed yet. Rather than wait, Fremont is advancing the funds and repaving the streets now. Here is how the whole thing works.

These streets used to be State Route 84

Thornton Avenue, Fremont Boulevard, Peralta Boulevard, and Mowry Avenue make up roughly three miles of road between Interstate 880 and Mission Boulevard. For decades, they carried state highway traffic as part of State Route 84 (SR-84) and were maintained by Caltrans. The pavement was built to highway specifications appropriate for the era, and Caltrans, not Fremont, was responsible for upkeep.

In 2018, State Senate Bill 989 authorized a relinquishment, the formal process by which the state hands a road segment to a local city government. Fremont's city council accepted the transfer in July 2019, and the California Transportation Commission approved it in October 2019. One key condition was built into the deal: before the handover, the state would pay to bring the pavement to a "state of good repair," a baseline condition standard that means the road surface is safe, functional, and not in need of immediate rehabilitation.

That condition sounded straightforward. The catch was where the money was supposed to come from.

Why the repair money was slow

The funding mechanism is unusual. The state's repair obligation is backed by proceeds from selling surplus land in Union City, parcels that Caltrans bought decades ago for a freeway (the SR-84 Historic Parkway) that was never built. In 2021, the California Transportation Commission approved conveying that land at an appraised value of $86.184 million, with the sale proceeds due into the repayment account by fiscal year (the state's annual budget cycle, running July to June) 2026-27.

The timeline slipped. Union City is negotiating with a housing developer for the parcels, and the sale has not closed. Per the City of Fremont and Mayor Raj Salwan, the land-sale proceeds may not arrive until roughly 2029. In the meantime, the streets sat with their original highway-era pavement, deteriorating under city traffic loads they were never resurfaced to handle.

What Fremont did instead of waiting

A state law, Assembly Bill 1386 (AB 1386), created a workaround. It allows Fremont to front the repair costs and be reimbursed from the eventual land-sale proceeds, so the city does not have to wait for Union City's deal to close.

The repair program is three phases totaling $17.72 million:

Per the mayor, the city is also asking ACTC to advance more of Fremont's own Measure BB share (see the FAQ below for what Measure BB is) so the later phases can start sooner. The advances would be repaid from the state land-sale proceeds. No new tax is involved.

The numbers in context

Fremont's citywide average pavement condition index, or PCI (a 0-to-100 score used by Bay Area transportation agencies, where higher is better), is 71, according to the 2023 Metropolitan Transportation Commission table. That is a solid rating. For comparison, here are some neighboring cities: Dublin 79, Pleasanton 77, Newark 72, Union City 70, Oakland 57.

But these four former-highway streets pull the average down hard. In an August 2026 public video and social-media thread, Mayor Raj Salwan put Peralta Boulevard's PCI at 29 out of 100, the city's worst, with Mowry Avenue close behind. Those numbers make the gap obvious: the problem was never Fremont's general maintenance. It was a handful of state roads that arrived in poor condition and stayed that way while the funding mechanism stalled.

What this means if you live or buy in Fremont

If you own a home on or near one of these corridors, the repair program is moving. Phase 1 is underway, and the city is working to accelerate Phase 2 and Phase 3. Per the city, the full program is funded through the advance-and-reimburse structure under AB 1386, so the work does not depend on new voter-approved revenue.

If you are buying a home along an arterial road (a major through-street that carries traffic between neighborhoods and connects to highways), check which phase covers that stretch and what the city's current timeline is. Peralta south of Sequoia Road, for example, falls in Phase 2, which has not started yet. Mowry is Phase 3. The city's public works department can confirm the schedule for a specific block.

Construction on your street is temporary disruption, but it ends with new pavement on a road that has needed it for years. That matters day to day: smoother driving, less tire and suspension wear, better drainage, and a street surface that matches the rest of the city.

This page is general information about a public infrastructure project and is not personalized real estate advice. Every home purchase has its own timeline, and the presence or absence of a road project is one factor among many.

Lily Garipova is a Bay Area real estate agent based in Fremont, with 13 documented closings and $16.8 million in local volume in the city. Across her career, she has closed 104 documented transactions totaling over $115 million. She works in English and Russian.

Lily holds Cal DRE license #02010731, has been California licensed since 2016, and has been in real estate since 2007. If you are buying or selling along Fremont's Centerville corridor or anywhere in the Tri-City area, she can walk you through how local infrastructure projects, market conditions, and neighborhood-level details apply to your situation.

Email: lilyagaripova@gmail.com

Phone: (415) 910-3958

Web: lilygaripova.com

Fremont, CA

Frequently asked questions

Why are Peralta Boulevard and Mowry Avenue in so much worse shape than other Fremont streets?

They were part of State Route 84, maintained by Caltrans until the state handed them to Fremont in 2019. The state was supposed to bring the pavement up to a baseline condition first, but the repair money is tied to a state land sale in Union City that has not closed. The streets sat with old highway-era pavement that was never resurfaced for city use, while the rest of Fremont's roads were maintained on the city's regular schedule. The result is a visible gap: most Fremont streets rate around 71 on the pavement condition index, while Mayor Salwan puts Peralta at 29.

When will Peralta and Mowry actually get repaved?

Phase 1, covering Thornton Avenue, Fremont Boulevard, and Peralta up to Sequoia Road, is underway. Per the city, Phase 2 (the rest of Peralta, $6.86 million) and Phase 3 (Mowry, $5.75 million) follow. The city is asking the Alameda County Transportation Commission to advance funds so those phases can start sooner. Exact timelines depend on funding approvals and construction scheduling, so check with the city's public works department for the latest on a specific stretch.

Who pays for the repaving, and will Fremont residents pay a new tax?

No new tax. The repairs are funded through an advance-and-reimburse structure under state law (AB 1386). The city and the Alameda County Transportation Commission front the money from existing sources, including Fremont's share of Measure BB funds. When the state land in Union City eventually sells (appraised at $86.184 million), the sale proceeds repay the advances. Residents are not assessed any additional charge.

What is Measure BB?

Measure BB is an Alameda County transportation sales tax approved by over 71% of voters in November 2014. It is administered by the Alameda County Transportation Commission and funds road maintenance, transit, bicycle and pedestrian projects, and other transportation improvements across the county. Fremont receives a share of Measure BB revenue each year, and part of that share is what the city is asking to advance for the Peralta and Mowry repairs.

Should bad pavement alone stop me from buying a home in Centerville?

Probably not. The roads are being fixed through a funded program, not an unfunded wish list. Phase 1 is already underway. That said, road condition is worth understanding in context: check which repair phase covers the street nearest the home you are considering, and factor in the construction timeline. A home on a street mid-project may see temporary lane closures and noise. A home on a street in Phase 2 or 3 may live with rough pavement for another year or more before work begins. These are practical logistics, not deal-breakers, but they are worth knowing before you make an offer.